Questionnaire For SCRAP PREHEATER
Sr Parameters Specifications
01 Equipment Scrap Preheating  System
02 Type Continuous Type Batch
03 Capacity

Kg/hr  or 8000Kgs/hr

Kgs/hr or 12000Kgs/hr

04 Input Scrap Bundle
Square Shape
Solid Scraps
Plates
Cuttings
Castings
Any other form
05 Fuel available Natural Gas
LPG
Diesel
Kerosene
06 Calorific value of fuel

(For Natural Gas Firing only primary air blower will be  in operation.)

07 Max temperature the scrap estimated to be elevated

     
08 Induction/Arc Furnace capacity crucible Kgs capacity

 

 

 

09 Existing scrap Transfer system Type Cost
10 Existing material



11 Temperature Measurement

Two Thermocouple Inconel sheathed to be placed  one at exit one at the Burner level.

 

 

 

 

Name*

Designation*

Company*

Address*

Cell No*

Email ID *

Website